Quote:
Originally Posted by blueash
.
Yes, that is how I understood it. But it does not seem to address the issue of who determined how to build the bridge, what supports it needed, and who determined that the land was solid enough to proceed. Whomever did that engineering, soil testing, or whatever should it would seem be liable for their error in determining the solidity of the ground and the type of bridge which it could support. That is why engineers have insurance to cover such error and omissions. I'm sure the district did not design the bridge, but if it did then our designers were at fault and we should be going after them for their error.
|
The bridge was built by The Villages, or their contractors, and opened for traffic about the time that Lake Sumter Landing opened in August 2004.
Since TV had it built, one can only assume that they did the engineering studies, etc, and got all the proper permits.