Sad Situation
Quote:
Originally Posted by WaterSun
i hired Corban Construction to replace my lanai with an addition. The project was to take 2 months after construction began. It took over 5 months.
Delays resulted from: lack of attention to the written contract and attached architectural drawings approved by the TV-ARC and Sumter Co. Bldg Dept; in attention to details; failure to order the windows and door timely; lack of supervision during work; and lack of quality-checks after completion of a stage in construction, such as concrete, electrical, plumbing, wallboard and spray-texture, siding, and etc. Additional delays resulted from a lack of or poor inspection of products prior to their installation; i.e., products that were damaged or wrong/poor quality were installed, then removed after homeowner's complaints and good replacements installed.
The owner is a nice guy, but being nice doesn't mean the work is good or on time.
|
So sorry to hear....that has to be very stressful. By any chance does your home back up to St. Charles? If so, I've seen that project struggle along for months....Hope things get better for you. Lack of supervision can definitely snowball into the disappointment you described. At a point you just want them off your property...
|