Quote:
Originally Posted by WaterSun View Post
I hired Corban Construction to do a project, demolish an lanai and build an addition in its place. The job was to take 2 months. It took 5 months. Delays resulted from poor planning, in attention to detail, not ordering the windows and door timely. Errors resulted from not following the written contract AND architectural drawings approved by the TV ARC and Sumter Co. Bldg Dept. Delays also resulted from the lack of supervision, lack of quality checks after each phase (concrete, carpentry, electrical, plumbing, siding, etc.), and lack of inspection of products some of which were damaged, others were wrong, or of poor quality.

Owner seems like a nice guy, but that doesn't mean his work is good or timely.
OK, I guess that thoroughly explains the difference between a courtyard villa and a patio villa. Thanks!
__________________
“ Beer is proof that God loves us and wants us to be happy. ”