I got 4 different bids for our pool. Had a 30 X 14 pool with spa, huge bird cage and a privacy wall. All 4 bids were within 3K of each other. I chose T&D even though they were the highest. However, start to finish was 3 months. One month for permits and 2 months for the build. They completed everything a month ahead of the original schedule. This included every possible option available. Solar and gas heating multiple waterfalls, remote control for everything, all LED lighting, and some things I forgot.
Very happy with how everything was done.
__________________
Life is to short to drink cheap wine.
|