Default Accurate

Quote:
Originally Posted by mulligan View Post
Concrete takes 28 days to cure 100% It is a specific chemical reaction when the portland cement is hydrated ( mixed with water). It doesn't matter whether you pour a patio slab, or dump it in the lake. 28 days later it is 100 % cured.
The portland cement google results say it gains most of it's strngth the first seven days.