Talk of The Villages Florida - View Single Post - A peek into one of the side agreements today??
View Single Post
 
Old 08-20-2015, 04:38 PM
Guest
n/a
 
Posts: n/a
Default

From the WIKI link that I suppose was to appease how I feel about this new secret deal relative to Parchin

"In November 2011, IAEA officials identified a "large explosive containment vessel" inside Parchin.[193] The IAEA later assessed that Iran has been conducting experiments to develop nuclear weapons capability.[194]"

"On 24 February 2012, IAEA Director General Amano reported to the IAEA Board of Governors that high-level IAEA delegations had met twice with Iranian officials to intensify efforts to resolve outstanding issues, but that major differences remained and Iran did not grant IAEA requests for access to the Parchin site, where the IAEA believes high-explosives research pertinent to nuclear weapons may have taken place."


AUGUST 2012....still from the same link...

"The report also expressed concerns over Parchin, which the IAEA has sought to inspect for evidence of nuclear weapons development. Since the IAEA requested access, "significant ground scraping and landscaping have been undertaken over an extensive area at and around the location," five buildings had been demolished, while power lines, fences, and paved roads were removed, all of which would hamper the IAEA investigation if it were granted access.[212]"

NOVEMBER 2012

"The November report noted that Iran has continued to deny the IAEA access to the military site at
  • Parchin
. Citing evidence from satellite imagery that "Iran constructed a large explosives containment vessel in which to conduct hydrodynamic experiments" relevant to nuclear weapons development, the report expresses concern that changes taking place at the Parchin military site might eliminate evidence of past nuclear activities, noting that there had been virtually no activity at that location between February 2005 and the time the IAEA requested access. Those changes include:

Frequent presence of equipment, trucks and personnel.
Large amounts of liquid run-off.
Removal of external pipework.
Razing and removal of five other buildings or structures and the site perimeter fence.
Reconfiguration of electrical and water supply.
Shrouding of the containment vessel building.
Scraping and removal of large quantities of earth and the depositing of new earth in its place.[218][221]"


NO NEED TO LINK..if you just click on the poster who believes this is no problem you can read all of it.