Quote:
Originally Posted by Guest
The materials alone are double Trump's estimate.

So no, I don't trust that Trump knows a damn thing about construction except how to act as a con man to sell it.

An Engineer does the Cost Estimate of Trump's Wall - Album on Imgur

Going off of materials estimate we have… 167,272,000 cubic yards of cast-in-place concrete at $93/cubic yard = $15,556,296,000 1,030,000 segments of 10’ pre-cast panels at $17/panel = $17,510,000 2,500,000 tons of steel rebar at $600/ton = $1,500,000,000


I know, I know...those pesky things called 'facts' again.
You are so not cool

Funny last I read it was not going to be concrete.