Quote:
Originally Posted by HiHoSteveO
No traffic stopping.
I recall a detour (one night Northbound, then one night Southbound) when they placed the beams for the new Rt 468 bridge (Morse Blvd) 3 or so years ago.
|
Totally different types of bridges.
The 468 bridge is made of two concrete spans, with a bent between the southhbound/northbound lanes...so was able to be built/set in two sections.
If the drawing in the paper is correct, the new Villages bridge will be a single span, setting on just two abutments (1 each end, outside of S/N lanes) and will be hard to safely set...without closing both directions of the Turnpike.
But hey...we'll see.