Quote:
Originally Posted by VillageIdiots
Interesting, thanks for sharing. I sure hope thoughts and planning are in the works because this needs to be done in the next 11 months to meet the connectivity schedule announced.
If you watch the January VMail, they mention that 2 of 4 connectivity bridges are scheduled to be done in 2019. I wasn't sure what to make of that. Assuming that 1 of the 4 is the 2nd turnpike bridge that was announced in 2018, what is the other that is NOT scheduled to be completed in 2019?
|
I think the two for 2019 completion are the bridge shown above and the bridge over 44 at Brownwood.
I think the two for later completion are the bridge over 44 at Rohan Rec Center and the bridge over the turnpike, south of the service plaza.
That's my guess.