When our house was manufactured in 2012 we needed the dining room light moved. It was covered under warranty . I asked the contractor who was sent to patch the ceiling about the textured ceilings and walls. He said that the reason was to hide all the imperfections (consequence of manufacturing the houses in 75 days). He mentioned without them you would see waves.
|