View Single Post
 
Old 06-03-2019, 06:25 AM
gomsiepop gomsiepop is offline
Senior Member
Join Date: Jul 2011
Posts: 339
Thanks: 21
Thanked 44 Times in 17 Posts
Default

We met with design on Wednesday and we signed the contract a week later on a Thursday. One day was spent designing our pool. We started out with a Laurel Oak and decided to go with a modified Ivy. The reason I say modified Ivy is because we utilized the size of the fourth bedroom and incorporated storage space with a half bath on the lanai, an enlarged master bedroom with an additional walk-in closet, a butler's pantry, a larger secondary bedroom and more. We wound up with a three-bedroom, 2 1/2 bath Ivy. The sky is the limit with the home we never dreamed we would one day own. We will close on our home in August and can't wait for that to happen. The process of design was exhausting for me and without the guidance of our design person our dream home would never have come to be. Traci was amazing!
__________________
It is a positive attitude towards life that makes dreams come true