Quote:
Originally Posted by gomsiepop
We met with design on Wednesday and we signed the contract a week later on a Thursday. One day was spent designing our pool. We started out with a Laurel Oak and decided to go with a modified Ivy. The reason I say modified Ivy is because we utilized the size of the fourth bedroom and incorporated storage space with a half bath on the lanai, an enlarged master bedroom with an additional walk-in closet, a butler's pantry, a larger secondary bedroom and more. We wound up with a three-bedroom, 2 1/2 bath Ivy. The sky is the limit with the home we never dreamed we would one day own. We will close on our home in August and can't wait for that to happen. The process of design was exhausting for me and without the guidance of our design person our dream home would never have come to be. Traci was amazing!
|
Sounds like your hard work paid off in transforming your house into a dream home. Good going.
Sent from my SM-N960U using Tapatalk