Quote:
Originally Posted by skyking
I don't know how long the design phase, etc. takes but I have watched homes go up. From the time the first workers show up on the lot to finish is about 57 days. The houses are all built on a tight schedule and if a subcontractor does not meet the schedule they are replaced.
|
That's an impressive pace,they must have things very organized. The houses I have visited appear to be very well built. Thanks