View Single Post
 
Old 09-19-2019, 10:38 PM
EdFNJ EdFNJ is offline
Sage
Join Date: Nov 2016
Posts: 4,395
Thanks: 1,376
Thanked 3,102 Times in 1,341 Posts
Default

Quote:
Originally Posted by OpusX1 View Post
it is done. They resurfaced each road about 1 mile from 466 south.
Seriously? I thought Morse and B.V. were supposed to be resurfaced all the way up to CR44! Guess not. The resurfacing stopped about 100yds north of probably the most messed up patched rough area of Morse! They didn't do the Morse bridge either. LOL. Amazing.