Quote:
Originally Posted by OpusX1
it is done. They resurfaced each road about 1 mile from 466 south.
|
Seriously? I thought Morse and B.V. were supposed to be resurfaced all the way up to CR44! Guess not. The resurfacing stopped about 100yds north of probably the most messed up patched rough area of Morse! They didn't do the Morse bridge either. LOL. Amazing.