In the December 2018 villages magazine a connectivity date was shown as Jan 2020.
A recent video from the villages now puts connectivity at May 2020.
In the November 2019 magazine insert, pictures are shown of the Water Lily bridge (turnpike bridge) and Chitty Chatty (Rohan RRC) bridge under construction, both are dated November 2019. Grossly incorrect and outdated, the Water Lily bridge main structure was completed months ago and can easily be seen from the Turnpike. The Chitty Chatty picture is at least a month or more old and out of date.

One cannot help but wonder if the slippage in the schedule is internally or externally driven? With at least five distinct large areas under construction by The Villages are the available resources spread a little too thin and schedules being reevaluated? Is the information and publicity pictures being released being intentionally muted to reduce expectations and cover for previously over zealous advertising to drive sales south of SR44?
__________________
Don Wiley
GoldWingNut (a motorcycle enthusiast not a gilded fastener)
Village of Hillsborough
www.goldwingnut.com
YouTube –YouTube.com/GoldWingnut and YouTube.com/GoldWingnutProductions
Carpe diem quam minimum credula postero
Society is produced by our wants, and government by wickedness; the former promotes our happiness positively by uniting our affections, the latter negatively by restraining our vices. - Thomas Paine, 1/10/1776