Old 01-27-2020, 05:49 PM
pacjag pacjag is offline
Senior Member
Join Date: Jun 2019
Posts: 147
Thanks: 3
Thanked 122 Times in 37 Posts
Default

Quote:
Originally Posted by John_W View Post
Look across the bridge in the photo, appears the base layer of a cart path and a high retaining wall have been installed. Paving should be next, however beyond that you're probably right, the bridge to nowhere.
The bridge in the photo is the pond bridge which leads to the highway 44 bridge, in the distance. Yes, that is the work I was referring to. On the other side of 44 I can not see that any work has been done. I guess they are going to do the approaches one at a time. After all, there is no hurry, apparently, since the bridge over the turnpike seems to be delayed.