Quote:
Originally Posted by ColdNoMore
So it really comes down to 2 reasons:
1. The developer purposely tried to save money, by laying asphalt of inadequate depth.
2. The engineers hired by the developer, didn't know what they were doing (or were directed what to do)...when designing/designating the road construction.
|
That's a silly post.
Your "1." Opinion, not fact.
Your "2." The County determined the spec's, not the engineers hired by the developer.