Quote:
Originally Posted by LuvtheVillages
No one knows the actual dates. The sales magazine in the paper earlier this week said that "connectivity" would happen by the end of 2020.
I have my doubts. Even if the bridge over the turnpike is in place, they still have to build the ramps up to it. Look how long it is taking to build the ramps to the Brownwood bridge.
|
That's because most likely, the bridges aren't a priority. In my opinion I think building the ramps would be the easiest part of getting the bridges ready for use.