Quote:
Originally Posted by vintageogauge
My thoughts are that they will open all 3 bridges at the same time.
|
I think that's a pretty good guess, given that two of the bridges ( Water Lilly and Brownwood ) will both connect to Meggison Rd which is currently being cut in on the north side of the Turnpike.
It's easy to imagine the great hype and fanfare that would accompany the ribbon cutting for all three bridges and "Connectivity" has finally been achieved.