Talk of The Villages Florida - View Single Post - Connectivity
Thread: Connectivity
View Single Post
 
Old 06-21-2020, 01:37 PM
Dond1959 Dond1959 is offline
Senior Member
Join Date: Jun 2018
Posts: 258
Thanks: 3
Thanked 532 Times in 150 Posts
Default

From the west side of the turnpike to get to Lake Deaton you would go over Water Lily and instead of heading north toward the Brownwood bridge you would head south along the MMP toward Warm Springs and through the tunnel that was just placed. Then head north on MMP to Lake Deaton. Not the shortest route but the best way until the Bexley Bridge is completed. That is assuming all the roads and MMPs are completed when the WaterLily bridge is completed.