Talk of The Villages Florida - View Single Post - Remodel Report
Thread: Remodel Report
View Single Post
 
Old 01-09-2009, 11:51 PM
sschuler1's Avatar
sschuler1 sschuler1 is offline
Veteran member
Join Date: Mar 2008
Location: Village of Hemingway
Posts: 711
Thanks: 0
Thanked 2 Times in 1 Post
Default

We just took the toilet out of the bathroom today, and yes it is sitting in the yard waiting for garbage day. (which is Monday morning) We live a hundred yards or so back from the road though, so no one but us is going to see it. All the demo is done, so we are on the downhill side of this remodel. We have started putting the countertop back together, the shower stall is up and the new dry wall is installed. We are staining the cabinet, tiling the countertop and floor, installing the new toilet and painting the walls. Sounds like a lot, but will go very fast. Can't wait until it is done. We have been torn up in the house now since Nov. 1st. Can't wait to start removing all the construction dust.
__________________
Traverse City, MI
Plymouth, MI
Village of Hemingway