During the build I checked the work every few days, yes minor issues they missed, I simply emailed my designer who contacted the builder and was corrected.

I also left notes and put blue tape on minor stuff so the builder would see it.
The guest bath cabinet was not level, a few days later the cabinet, mirror & plumbers were there removing all of it. Now perfect

The only major error was my bird cage they had the wrong plans on site, I happened to be there. Met the TD supervisor who checked our contract he had new plans which were texted over in 30 minutes. If I wasn't there it would have to be taken down & redone.

When elec was being done I made numerous changes and went over everything with the sub as they were working (not supposed to do that) but they were very happy to do the work once rather than redo it.

Because I was on top of everything as of today there is nothing to adjust or fix.
So the walk thru in about two weeks will take 5 minutes.

Also not going to bothered with people coming in to fix stuff later.

100% happy with the quality of build (my designer) and the subs on the home, we close on the 29th.

Having built a few homes back in NY I had experience in construction.