OK, so you don’t know. Pretty much what I suspected.
Quote:
Originally Posted by Advogado
That will have to be determined by the results of an impact study.
As another poster earlier explained, the amount of impact fees has to be determined by a calculation of the infrastructure costs imposed on the county by the new construction. That is why the County Commission needs to immediately contract for a study of the cost of non-road infrastructure.
An impact-fee study was done in 2019 with respect only to roads, and then the puppet commissioners only imposed a road impact fee in 40% of the amount justified by the study-- while increasing our taxes by 25%. Thus, it would seem, on the basis of that study, the current ROAD impact fee could immediately be increased by 150%, i.e. up to 100% of the amount shown in the 2019 study.
|