View Single Post
 
Old 04-21-2021, 06:24 PM
OrangeBlossomBaby OrangeBlossomBaby is offline
Sage
Join Date: Feb 2015
Posts: 8,584
Thanks: 6,919
Thanked 9,573 Times in 3,131 Posts
Default

Quote:
Originally Posted by CFrance View Post
We moved here in 2011, and 441 was a construction nightmare for a year or more, maybe two. It took forever.

Then "they" decided to widen 466A from Powel Road to 301, and that-few block construction took two full years.
Well that's what happens when you have a place as busy and successful as the Villages, which is showing no signs of slowing down new development. It attracts more people, which attracts more commerce, which all combines to attract a LOT more traffic, which means roads have to be widened, repaved, repainted/lined, new driveways need to be built out, new water and underground electric cables installed to connect to the new sections, and by the time you're done with all of that, everything you did the first time around, needs to be upgraded so you have to start all over again.

If you want this to stop, then you need to convince the Morse Family to either stop or significantly slow down development. They own most of the land now, so no one else will be building on it.