Quote:
Originally Posted by Robbie0723
The process starts after the design meeting and historically has been three Months.. They do not miss a closing date.
|
Unfortunately that is no longer true. Because of material shortages some homes in St. Catherine were pushed out by up to 5 weeks. Windows were an issue for a few months. Our house was actually built without the master bedroom window being installed. It finally showed up about two weeks prior to closing. Many houses (ours included) closed without all the appliances being installed. When we moved in (late April) all we had was the cooktop. Three weeks ago we finally got our oven/microwave and two weeks ago we got our range hood. Thankfully we had a summer kitchen installed so we had the grill to cook on.