Quote:
Originally Posted by Stu from NYC
Wonder when it will open?
|
On the video said one year to develop plan, so maybe (9/2022) and then 2 years to build (9/2024). This will be the 5th build, I would guess the time line that was stated would be about the same as the other squares, or now lifestyle area.
Would this be the first one to have a hotel built by developer? The man made lake will be very interesting.
We started coming in 07. SS was in full development, and LSL was in early stages of occupancy. Remember Brownwood being built, but really didn’t pay attention to how long it took from start to when the first tenant arrived.
Sawgrass seems to be going slow, but if build takes 2 years, that will be awhile before entertainment and first retail occupancy.
Goldwing May have a better timeline on how long it took to build other squares.