Quote:
Originally Posted by Traveling lady
If this was put up by the developer’s contractor, using inferior products, the developer and the contractor should be required to replace them.
|
The common denominator in a lot of things like this (premature road degradation being one), was the developer using sweetheart-deal/sole-source contractors. Since the developer was able to hand over most of the maintenance once the infrastructure was built (at highly inflated valuations), I predict a drip-by-drip of similar premature failures - in coming years.