Talk of The Villages Florida - View Single Post - Stormwater Drain Construction
View Single Post
 
Old 05-09-2022, 10:45 PM
The Gazette's Avatar
The Gazette The Gazette is offline
Editor
Join Date: Jul 2021
Location: The Villages Florida
Posts: 1,187
Thanks: 0
Thanked 558 Times in 365 Posts
Default Stormwater Drain Construction

Beginning on approximately May 18, there will be construction on a stormwater manhole by the multi-modal path south of the MR-3 golf car tunnel. This location is adjacent to Meggison Rd. north of the intersection at Warm Springs Ave. During construction, the multi-modal path will have a short diversion to drive safely outside of the

More...