Quote:
Originally Posted by yabbadu
Has there been anything printed that explains WHY they do NOT appear to be removing the NB Bridge portion over CR25. Today I noticed they are tapering the side dirt and installing grass mats. Bridge DE-Construction seems to have stopped over CR25.
Needless to say all of the torn up roadwork in both directions seems to be non existent. Is this another five year boondoggle?
Anybody know any facts?
|
This is a Florida project, slow and slower.
Similar when calling for service at your house:
"We'll be there on the 14th in 3 months from today between 9:00 a.m. and 5:00 p.m. maybe".