Quote:
Originally Posted by Tvflguy
What? Cost doubles…why? Sure didn’t hear. They only cut about 4’ of the driveway so the pavers met the curbing height. No other base-work at all. That said much less labor to lay directly onto the cement.
|
If it was a project where a contractor used concrete as his base instead of sand the total cost of the job would be close to double. I envisioned an entire driveway or sidewalk being done. You still got the best job with concrete.
Less labor for pavers into cement or concrete? Cement is an ingredient in concrete.
If you are happy that's all that counts.