Quote:
Originally Posted by Shadowrider
I have a contract to have a screened cage added to my home. The concrete pad was poured rather quickly. I am now waiting for the cage to be built. I has been over 8 months. Every time I call the contractor they say probably another 3 months. They claim to be waiting for materials. I know there have been material shortages recently. Has anybody else had trouble getting a cage built?
|
I had a pool installed with birdcage installed. It took 3 months from first shovel in the ground to project completion. I think, once the foundation was complete, the birdcage took 2 or 3 days.
So 8 months for only a birdcage is excessive.
If only a birdcage, probably 4 weeks MAX.