Quote:
Originally Posted by Shadowrider
I have a contract to have a screened cage added to my home. The concrete pad was poured rather quickly. I am now waiting for the cage to be built. I has been over 8 months. Every time I call the contractor they say probably another 3 months. They claim to be waiting for materials. I know there have been material shortages recently. Has anybody else had trouble getting a cage built?
|
Really would like to know your contractor. I am having same problem. Our contractor took 3 months just to apply for a permit.
__________________
Real Name: Steven Massy Arrived at TV through Greenwood, IN; Moss Beach, CA; La Grange, KY; Crystal River, FL; The Villages, FL
|