Quote:
Originally Posted by JP
301 is scheduled for a redo to 4 lanes in 2025.
|
It looks like the construction will be completed much later than 2025. The Right Of Way phase is scheduled for 2026/ 2027. Construction comes after ROW property acquisitions. The document below is from June 2022.
http://www.lakesumtermpo.com/media/f...06-01-2022.pdf