Default Morse Blvd. Traffic study

As a resident of CDD1 who frequently travels Morse Blvd (especially between the intersections with San Marino and 466) I have a strong interest in this issue. I just finished an exhaustive review of the Kimberly Horn Report outlining the situation as well as the two proposed modifications to the current traffic system. My conclusions are as follows, from the prospective of a golf cart driver:

- Unlike many others, I don’t find the current system to be that bad. The only part of the existing system I really dislike is the crossover for south bound cart traffic just north of the gate leading to 466.
- The benefits of the two proposed traffic modifications (separating golf carts from automobile traffic and bicycle traffic (under one alternative), and eliminating the crossover north of the 466 gate), are far outweighed by the disadvantages (multiple stops created at road crossings as well as a nightmarish crossover of Morse south of San Marino and north of the Postal Station).
- The work required for either alternative will be very disruptive for an extended period of time and significantly change the character of the existing mature area.
- The modifications required under either alternative would be very disruptive to many unfortunate abutters to the involved areas (it wouldn’t affect me).
-Sumter County wants nothing to do with the project, making permitting and cost sharing a very difficult task.
- Both of the proposed traffic modifications are expensive and it appears the cost burden would be solely that of the 3,400 CDD1 residents at a cost of roughly $4,500 per residency. And that’s before the typical cost overruns.

Based on these observations/conclusions, I say leave things the way they currently are, or significantly downsize the project and try to find a way to improve the crossover for southbound traffic just north of the 466 gate.

That’s one persons opinion, I’m sure others will be different.