OP, you will need to ask the contractor, this varies. If you have a lot of stuff, you may want to discuss having the project done in 2 or more steps with the stuff moved to one side, the other side cleaned and coated, then move the stuff to the coated side, and do the other side, and finally moving the stuff to final location.
The other item you will need to discuss in making sure the floor will not be slippery when it is wet. I prefer to have shark grip or equal friction additive in the final coat of the floor. I have seen people report that just having the "flakes" is enough to keep the floor from being slippery, not sure I believe this.