I agree with not moving in for at least the first week. If you see defects during your closing walkthrough, tell them you want them fixed before you sign - it's the last time you'll have any real power to get things fixed. They want you to sign and moved in ASAP. If you can, come in and check on the build as it progresses and report anything wrong. Best time to have things fixed is before closing. If you can't be here, hire Don Wiley (Goldwingnut) to take photos and video of the construction and have him report defects to you.
Hire an inspection for the day after closing to check for defects, especially cosmetic ones that must be reported in the first week. With the list submitted, warranty should come in and fix everything properly. If they don't, it's possible you can get your lodging covered for that time.
|