
12-15-2023, 11:45 AM
|
Sage
|
Join Date: Jun 2019
Posts: 4,597
Thanks: 1,937
Thanked 3,533 Times in 1,693 Posts
|
|
Quote:
Originally Posted by pikeselectric
Good morning Altavia, The NEC 2023 code (although 2023) is not being adopted into Building code/Counties of residence in Florida at this time. However, NEC 2020 code begins 1/1/24 for Sumter, Lake, Marion counties. The 2023 code also requires any new construction dwellings to have surge protection that are going through construction/permitting. 2023 NEC is coming, but not yet. Counties adopt the codes when they are ready.
|
Thanks and understood that the local codes usually lag behind to give business time to catch up.
|