Quote:
Originally Posted by retiredguy123
The original post is not clear .
|
123, as I read it......OP called to schedule and was told the new price during the "called to schedule" call.
when I called them to schedule the installation -- about 15 minutes after the guy left -- was told by a "supervisor" that the quoted price was wrong