Geez...was my original post REALLY that hard to understand? Many like this guy in Post #18 (
Bill14564) could. I'm amazed at the number who could not!
Quote:
Perhaps:
- Customer asked for an estimate
- Representative came to customer's home
- $700 estimate provided
- Representative left
- 15 minutes passed
- Customer called to schedule installation based on $700 estimate
- Supervisor states that estimate was wrong and correct quote is $900
|
To be even MORE specific, with apologies to those who did originally understand:
1) Called Lenhart for an estimate
2) Lenhart estimator came out and gave written estimate for $700 to install 50amp breaker and outlet about 50' from service panel.
2) About 15 minutes after estimator left and I checked my calendar, I called their office to schedule work to be done.
3) I was put on hold for a few minutes while scheduler checked with supervisor.
4) When she came back on, I was told the estimator's quote did not include everything needed and the actual price would be $900.
I have 2 other companies coming out for quotes, one of which is Pikes, next week.
FYI - Lenhart did call back later that day apologizing for estimator's mistake.