Quote:
Originally Posted by retiredguy123
The original post is not clear about whether the quote was changed before or after the work was completed. Maybe the OP can clarify that point? If the quote was changed before the work was done, then the OP could have cancelled the job. Apparently, the quote was changed 15 minutes after the guy left? Left from where? I assumed the OP meant the guy had finished the job and left the OP's house. Very confusing.
|
It was clear to me that the price went up before the work was done.