View Single Post
 
Old 02-13-2024, 08:59 PM
kkingston57 kkingston57 is offline
Platinum member
Join Date: Mar 2020
Posts: 1,668
Thanks: 60
Thanked 733 Times in 408 Posts
Default

Quote:
Originally Posted by BrianL99 View Post
You've obviously not experienced Terminal C.

$2.8 BILLION dollar construction job that recently opened and the entire building has to be redesigned, because the airport CEO and Airport Authority are ego-maniacs and went for bling and not practicality. Your walk in Terminal C can be over 1/2 mile.
Agree and have been there. Call it the Jet Blue Terminal. Like them but now at near the bottom of my list due to this terminal.