Quote:
Originally Posted by Altavia
Never say never ;-)
Bexely Trail is a 4 lane county road across the Turnpike with cart paths along side.
The 470 bridge will need to be replaced as part off the 470 widening. So the possibility is there.
The old southern Warm Springs bridge probably needs to be replaced for the widening. Significant Commercial space is reserved at that corner. There's already a cart tunnel there and the power lines jog south making room.
Some of these new bridges South of us include pedestrian/bike lanes across the Turnpike bridges. Not that big a leap to make them cart lanes.
|
They shouldn’t have to widen the span on Warmsprings, because the existing median gives quite a bit of wiggle room for two more lanes. Do you really see the state spending massive amounts of cash to accommodate cart crossings over a must-have on and off ramp for the state turnpike on 470? It’s not just a bridge with cart paths when you factor in the logistics for such a project.