Talk of The Villages Florida - View Single Post - Lake-Sumter 2045 Long Range Transportation Plan
View Single Post
 
Old 04-30-2024, 01:34 PM
Altavia Altavia is offline
Sage
Join Date: Jun 2019
Posts: 4,594
Thanks: 1,937
Thanked 3,528 Times in 1,691 Posts
Default

Quote:
Originally Posted by Stu from NYC View Post
Have to believe Costco will speed up the process of connecting to I 75. Do not think they would have agreed to come here without that
Agree, unsure if that was in previous versions of the planning.

An interchange at I 75/CR 475 is in discussion. Much of the land along 466 between I 75 and 301 is for sale.
Attached Thumbnails
The Villages Florida: Click image for larger version

Name:	IMG_7737.jpg
Views:	312
Size:	23.8 KB
ID:	103925  

Last edited by Altavia; 04-30-2024 at 01:51 PM.