
05-01-2024, 08:12 PM
|
Sage
|
Join Date: Jun 2019
Posts: 4,593
Thanks: 1,937
Thanked 3,528 Times in 1,691 Posts
|
|
Quote:
Originally Posted by Normal
Sure, we all know the turnpike is getting widened, I was referring to the crossing structure over the state owned turnpike. The study for the county road 470 bridge and it’s widening along with the supposed multimodal path isn’t in the state records. I found the study for the Bexley bridge, but not for the 470 idea. Surely the unprecedented massive structure will have one.
|
Because design work is just starting...
The 470 bridge is not wide enough to add 4 new lanes so required replacement.
Interchange design budget for 470 was approved early this year, design phase will start this year.
WIDEN TURNPIKE MAINLINE/SR 91
FROM US 27 TO CR 470
Work includes pavement widening, milling and resurfacing, maintenance of traffic plan, new stormwater treatment facilities, new bridge structures, new ramp, tolling sites, signing, pavement marking improvements, signals, lighting, communications, and right-of-way acquisition.
https://www.talkofthevillages.com/fo...360-post2.html
|