Quote:
Originally Posted by Normal
Magnolia is still waiting for the golf cart crossing along Warm Springs over the turnpike. The dead end path still sits with a barricade.
|
There's a bunch of other ways to get to Magnolia from every direction. That path won't be open for at least 15 years or possibly never depending on what they eventually build but either way it won't be started for another 6 years at least. If the developer is responsible then it might take 10 years to do the bridge.
Everyone saw how the Waterlily bridge which was prefab offsite took longer to complete than the San Francisco Golden Gate bridge (4.5 years) from start to finish which was way over 100x longer than Waterlily.