Talk of The Villages Florida - View Single Post - The Villages Construction Update #141 - The Village of Well Point under construction!
View Single Post
 
Old 05-14-2024, 07:13 AM
Maker Maker is offline
Veteran member
Join Date: Jul 2022
Posts: 638
Thanks: 13
Thanked 567 Times in 251 Posts
Default

You seemed to wonder why the shift to building Wellpoint...
There are a few dots popping up, and what if they are connected like this.
Megisson/Morse tunnel being inspected for sinkholes. It's so new, why the concern? Thinking there are structural problems observed and using ground penetrating radar is not normally needed unless they are looking for something very serious.
Golf cart travel to Sawgrass, and points south needs that tunnel. If that tunnel is closed long term, what alternatives are available?
Corbin Trail could be the link they will need. But it's blocked off for construction.

So what if developer has had some information (for many months) that points to a long term closure of that tunnel?
Recognizing the need for golf cart connectivity between everything being built south, to Brownwood, stores, gasoline, etc,... he shifted focus upon getting Wellpoint done asap so he can open Corbin and McNeil.

Thoughts?
Wonder if another bridge is in the works over the turnpike. Maybe Warm Springs Rd?