Quote:
Originally Posted by almondz View Post
Good - that is the prettiest path in TV but the surface is a disaster. And can't blame pot holes on tree roots. It needs resurfaced, not just patched evey 3-4 months. The patches have not held up and are sometimes as rough as before the patching. Perhaps a contractor problem.
Hopefully they will repave the entire path, not patch.