Talk of The Villages Florida - View Single Post - CDD 14 Maintenance Assessment Analysis
View Single Post
 
Old 08-27-2024, 10:50 AM
Bobfar1 Bobfar1 is offline
Junior Member
Join Date: Apr 2024
Posts: 2
Thanks: 0
Thanked 2 Times in 2 Posts
Default Allocation

I did find an allocation schedule for the EMAC cost that I missed. Your comment that perhaps CDD 15 was being over allocated was valid. However, per the attached sheet, the allocation of EMAC costs is based upon "Assessable Acres". For 24-25 the allocation was 50.08 acres for Eastport Downtown (2.49%), 639.75 acres for District 14 (31.85%), and 1,318.94 acres for District 15 (65.68%). Not sure what the "Assessable Acre" really means.

District 15 Maintenance Assessment was based upon 639 acres. Not sure why the difference between 1,318.95 assessable acres and the 639 acres. The district 15 "Facts" page indicates 1,378.40 total acres.

District 14 Maintenance Assessment was based upon the same 639.75 acres as the EMAC allocation. The Assessable Acres for District 14 was 639.60 for 23-24 EMAC allocation. So not much increase between the two years, yet a 56% increase? What am I missing?
Attached Files
File Type: pdf EMAC Allocation 24-25.pdf (497.3 KB, 231 views)