Ok, how much to buy the Seco meter device? How much will the power company charge to replace it when the time comes.
I’ve heard they have an indicator light, showing the health of the unit. It will eventually need to be replaced, as they degrade each time it takes a surge. How long this will take depends on the power of the surge.
I’ve heard leasing can cost $7-$10 a month. I would assume the unit would be replaced for free when needed.
|